Transportation

 Railways

HCC’s first contribution to India’s infrastructure was the Bhor Ghat tunnel section of the Mumbai – Pune railway line in 1926. Since then the firm has achieved countless milestones that include cross-country railway lines, more than 56 rail bridges,  metro lines, underground / semi-underground railway station buildings and support infrastructure such as rail coach factories and railway yards.

  • HCC has built railway tunnels and bridges in the most challenging of geological conditions, including Himalayan terrain which is relatively young and volatile
  • HCC’s structures are built to provide all-terrain, all-weather connectivity in the remotest of locations and under the toughest of climatic conditions
  • The company has built bridges across deep seas, creeks and turbulent rivers
  • HCC is proficient in a wide array of construction methodologies for both concrete as well as steel structures

 

Major Projects:

  • Bogibeel Rail-cum-Road Bridge, Assam (2018)
  • Pir Panjal Tunnel, Jammu & Kashmir (2012)
  • Munger Rail-cum-Road Bridge, Bihar (2007)
  • Godavari Railway Bridge, Andhra Pradesh (1988)
  • Ganga Bridge at Mokameh, Bihar (1959)
  • Bhorghat Tunnel, Maharashtra (1928)

Image Gallery

Whoops, looks like something went wrong.

1/1 ErrorException in Filesystem.php line 81: file_put_contents(): Only 0 of 295 bytes written, possibly out of free disk space

  1. in Filesystem.php line 81
  2. at HandleExceptions->handleError('2', 'file_put_contents(): Only 0 of 295 bytes written, possibly out of free disk space', '/home/hccindia/public_html/vendor/laravel/framework/src/Illuminate/Filesystem/Filesystem.php', '81', array('path' => '/home/hccindia/public_html/storage/framework/sessions/639d76deeb43ec279836f4becea6db0046ec0934', 'contents' => 'a:4:{s:6:"_token";s:40:"Nh9yacMA2xgrHEGCIa0yGKUyz6iSz1hdJEZxDXHG";s:9:"_previous";a:1:{s:3:"url";s:58:"https://www.hccindia.com/public/index.php/markets/railways";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1634930160;s:1:"c";i:1634930160;s:1:"l";s:1:"0";}s:5:"flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}', 'lock' => true))
  3. at file_put_contents('/home/hccindia/public_html/storage/framework/sessions/639d76deeb43ec279836f4becea6db0046ec0934', 'a:4:{s:6:"_token";s:40:"Nh9yacMA2xgrHEGCIa0yGKUyz6iSz1hdJEZxDXHG";s:9:"_previous";a:1:{s:3:"url";s:58:"https://www.hccindia.com/public/index.php/markets/railways";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1634930160;s:1:"c";i:1634930160;s:1:"l";s:1:"0";}s:5:"flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}', '2') in Filesystem.php line 81
  4. at Filesystem->put('/home/hccindia/public_html/storage/framework/sessions/639d76deeb43ec279836f4becea6db0046ec0934', 'a:4:{s:6:"_token";s:40:"Nh9yacMA2xgrHEGCIa0yGKUyz6iSz1hdJEZxDXHG";s:9:"_previous";a:1:{s:3:"url";s:58:"https://www.hccindia.com/public/index.php/markets/railways";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1634930160;s:1:"c";i:1634930160;s:1:"l";s:1:"0";}s:5:"flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}', true) in FileSessionHandler.php line 71
  5. at FileSessionHandler->write('639d76deeb43ec279836f4becea6db0046ec0934', 'a:4:{s:6:"_token";s:40:"Nh9yacMA2xgrHEGCIa0yGKUyz6iSz1hdJEZxDXHG";s:9:"_previous";a:1:{s:3:"url";s:58:"https://www.hccindia.com/public/index.php/markets/railways";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1634930160;s:1:"c";i:1634930160;s:1:"l";s:1:"0";}s:5:"flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}') in Store.php line 262
  6. at Store->save() in StartSession.php line 88
  7. at StartSession->terminate(object(Request), object(Response)) in Kernel.php line 145
  8. at Kernel->terminate(object(Request), object(Response)) in index.php line 323