Mumbai Coastal Road Project

October 03, 2018: Hindustan Construction Company Ltd. (HCC), in a joint venture with Hyundai Development Corporation (HDC), has been awarded a Rs. 2,126 crore contract by the Municipal Corporation of Greater Mumbai (MCGM), for design and construction of the Mumbai Coastal Road Project, Package II. HCC's share in the JV is 55% (Rs. 1,169 crore) and the project is to be completed in 4 years (48 months).

The scope of work includes design and construction of road, bridges, interchanges including reclamation and associated works between Baroda Palace near Haji Ali and the Worli end of Bandra Worli Sea Link.

Whoops, looks like something went wrong.

1/1 ErrorException in Filesystem.php line 81: file_put_contents(): Only 0 of 311 bytes written, possibly out of free disk space

  1. in Filesystem.php line 81
  2. at HandleExceptions->handleError('2', 'file_put_contents(): Only 0 of 311 bytes written, possibly out of free disk space', '/home/hccindia/public_html/vendor/laravel/framework/src/Illuminate/Filesystem/Filesystem.php', '81', array('path' => '/home/hccindia/public_html/storage/framework/sessions/5f5db82efe3b93a38f92b9d4a92dc3536932d954', 'contents' => 'a:4:{s:6:"_token";s:40:"4oH7Jm0H5u5UBp7UVbIg1WJrPHlFKnh1queU6R7u";s:9:"_previous";a:1:{s:3:"url";s:74:"https://www.hccindia.com/public/index.php/news/mumbai-coastal-road-project";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1634931192;s:1:"c";i:1634931192;s:1:"l";s:1:"0";}s:5:"flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}', 'lock' => true))
  3. at file_put_contents('/home/hccindia/public_html/storage/framework/sessions/5f5db82efe3b93a38f92b9d4a92dc3536932d954', 'a:4:{s:6:"_token";s:40:"4oH7Jm0H5u5UBp7UVbIg1WJrPHlFKnh1queU6R7u";s:9:"_previous";a:1:{s:3:"url";s:74:"https://www.hccindia.com/public/index.php/news/mumbai-coastal-road-project";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1634931192;s:1:"c";i:1634931192;s:1:"l";s:1:"0";}s:5:"flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}', '2') in Filesystem.php line 81
  4. at Filesystem->put('/home/hccindia/public_html/storage/framework/sessions/5f5db82efe3b93a38f92b9d4a92dc3536932d954', 'a:4:{s:6:"_token";s:40:"4oH7Jm0H5u5UBp7UVbIg1WJrPHlFKnh1queU6R7u";s:9:"_previous";a:1:{s:3:"url";s:74:"https://www.hccindia.com/public/index.php/news/mumbai-coastal-road-project";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1634931192;s:1:"c";i:1634931192;s:1:"l";s:1:"0";}s:5:"flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}', true) in FileSessionHandler.php line 71
  5. at FileSessionHandler->write('5f5db82efe3b93a38f92b9d4a92dc3536932d954', 'a:4:{s:6:"_token";s:40:"4oH7Jm0H5u5UBp7UVbIg1WJrPHlFKnh1queU6R7u";s:9:"_previous";a:1:{s:3:"url";s:74:"https://www.hccindia.com/public/index.php/news/mumbai-coastal-road-project";}s:9:"_sf2_meta";a:3:{s:1:"u";i:1634931192;s:1:"c";i:1634931192;s:1:"l";s:1:"0";}s:5:"flash";a:2:{s:3:"old";a:0:{}s:3:"new";a:0:{}}}') in Store.php line 262
  6. at Store->save() in StartSession.php line 88
  7. at StartSession->terminate(object(Request), object(Response)) in Kernel.php line 145
  8. at Kernel->terminate(object(Request), object(Response)) in index.php line 323